Passive In-situ Remediation of Acidic Mine / Industrial Drainage

(PIRAMID)

A Research Project of the European Commission Fifth Framework Programme

(Key Action 1: Sustainable Management and Quality of Water)

Contract Number EVK1-CT-1999-000021

The PIRAMID project was completed in the Summer of 2003.

From this page you can download FREE copies of:

  1. The PIRAMID Guidelines: comprehensive engineering guidelines for the passive remediation of acidic and / or metalliferous mine drainage and similar wastewaters
  2. The PIRAMID Final Report: The public version of the final report on the entire PIRAMID project, with full details of the PIRAMID Consortium, project objectives and methodology, key findings and an exhaustive bibliography of publications in which further details of the project's results may be found.

 